Construction sites · 26 October 2026

Uni Mail, Stage 1: the underlayers are laid

The underlay has been laid. Now it’s time to install the photovoltaic panel supports.

On the roof of Uni Mail in Geneva, the underlay has been laid. It is now time to install the mounting frames for the solar panels.

Weighted supports, and grating which itself retains some of the water. The supports that will hold the panels are then placed on top of these.

That’s it for the first part.

In brief

  • The underlay, laid
  • Weighted supports
  • Grating that retains some of the water
  • Ready to install the solar panels
Image taken from Florian Chitra’s video: Uni Mail, Stage 1: the underlayers are laid

Planning a green roof?

Are you an architect, a main contractor, a local authority or a waterproofing contractor? Give us a call or drop us a line – we’ll be happy to help.

Similar Posts