Construction Sites · 23 October 2026
Uni Mail, Step 1: the equipment is delivered
ZinCo underlays and photovoltaic panels are hoisted onto the roof via a derrick.
A look back at the Uni Mail construction site in Geneva. The Schöni lorry has delivered all the materials. On the agenda: underlay from ZinCo and everything needed for the photovoltaic panel mounts.
All that remains is to hoist everything up onto the roof, nine storeys up. To do this, we use a derrick – a lifting tower with a winch at the very top.
Thanks to Sedelec for the help!
In brief

Further reading
Planning a green roof?
Are you an architect, a main contractor, a local authority or a waterproofing contractor? Give us a call or drop us a line – we’ll be happy to help.
