Phase 1: 60 m² out of 300 m² · St Gallen (SG)
Migros TEO, St Gallen: planters for green roofs, manufactured in Gland
An order from ZinCo AG. 10-cm trays, loaded at the nursery, bound for eastern Switzerland.
300 m²
total number ordered
60 m²
as the opening act
10
industrial pallets
10 cm
tray height
The project
Loading at the nursery: 10 industrial pallets, with 10 cm high trays, on their way to St Gallen and Migros TEO.
Many thanks to ZinCo AG for the order. From our nursery all the way to eastern Switzerland.
Project details
| Destination | Migros TEO, St Gallen |
| Order | ZinCo AG |
| Containers | 10 cm high |
| Part One | 60 m², 10 industrial pallets |
| Total order | 300 m² |
| Loading | October 2026, at the Gland nursery |
The system used and our reference points:

Off to St Gallen for Migros TEO!
News about this project
Planning a green roof?
Are you an architect, a main contractor, a local authority or a waterproofing contractor? Give us a call or drop us a line – we’ll be happy to help.
